Showing posts with label factory equipment. Show all posts
Showing posts with label factory equipment. Show all posts

Saturday, October 19, 2019

Lakeside Company estimated manufacturing overhead costs for 2009 at $378,000, based on 180,000 estimated direct labor hours

Lakeside Company estimated manufacturing overhead costs for 2009 at $378,000, based on 180,000 estimated direct labor hours. Actual direct labor hours for 2009 totaled 195,000. Manufacturing overhead contains debit entries totaling $391,500. What was the amount of manufacturing overhead for 2009?



A) $31,500 underallocated
B) $31,500 overallocated
C) $18,000 underallocated
D) $18,000 overallocated



Answer: D


The journal entry to record $200 of depreciation on factory equipment for the current period involves which of the following?



A) debit to accumulated depreciation-factory equipment for $200
B) credit to manufacturing overhead for $200
C) debit to depreciation expense-factory equipment for $200
D) debit to manufacturing overhead for $200


Answer: D


Bull Gator Industries is considering a new assembly line costing $6,000,000. The assembly line will be fully depreciated

Bull Gator Industries is considering a new assembly line costing $6,000,000. The assembly line will be fully depreciated by the simplified s...